The cabinetry is all done now and it looks fantastic. I can't work out how to take pics of the bigger cabinets so there are just some pictures of bits of the cupboards!
Frank's drawers in the walk in robe
Part of Frank's hanging space in WIR
Helen's drawers and hanging space
Kitchen complete with handles
Helen's shoe racks on the left and more hanging space
Bathroom cupboard looking through to hallway linen
Bedroom 2 built in desk and wardrobe with feature cornice
Bedroom 3 built in robes
powder room vanity complete with handles but no sink or taps yet
the kitchen cupboards
The granite guy has done his final measurement, the carpet, showerscreens and mirrors are booked. The floor guy starts polishing on the 6th october. We are on track to move in at the end of October. We just need to decide on our splashback which goes in 1 week after the granite benchtop.
Tuesday, September 30, 2008
Friday, September 12, 2008
More pics
Here is one week's work. Things are really progressing now. We have narrowed down the carpet selections, the sparky has started putting in the powerpoints and the cabinet handles should go on over the weekend. The walk in robe hasn't gone in yet but the materials have been ordered. The design I drew didn't fit in the room (never was a mathematician) so the cabinet maker had to re-design it all. Will be good to see how it works out.
Better pic of the ensuite
View of the kitchen from the stacker slider doors. they have been painting the doors so they are all spread out drying. We also had a couple of people come and measure up for the granite benchtops today.
View from the kitchen, up the main hallway to the open front door.
Monday, September 08, 2008
Some colours!
The painters are more than 1/2 way through. We love the wall colour (wattyl Ermine White) that flows through the house. not 100% sure about the bedroom feature (browny colour), but love the dining room feature (red). They have done a great job so far and have been really accommodating of our (read my) changes of mind by painting just a little bit of the cornice, waiting for us to see it and then doing the rest or changing it. The electrician has started to put the powerpoints in and the cabinet maker has put the benchtops in the bathrooms. We have bought pretty much all the lights and have narrowed down the carpets. The belly keeps growing but we should be well and truly in by then!
The dining room feature colour
The blue cornices through the hallways
The greyish - browny colour in the master bedroom ; also continued through cornice
the double vanity in the ensuite is finished. basins, taps and light to go in soon!
The dining room feature colour
The blue cornices through the hallways
The greyish - browny colour in the master bedroom ; also continued through cornice
the double vanity in the ensuite is finished. basins, taps and light to go in soon!
Tuesday, September 02, 2008
Getting Painted!
The tiles are finished, the paint has started. The carpet still needs to be chosen and booked (woops, our fault!) and we have finally decided not to go for a laminate kitchen benchtop so have to organise some quotes for granite and then buy baked beans for dinner for the next 5 years! in other news, the baby belly is growing which is very exciting. Some pics for the die hards!
From the front door looking to back open plan area
Ensuite double shower with shower niche and feature tile (fancy shmancy!)
The ensuite toilet section (and me in the reflection) with 1/2 wall to rest all the magazines on!
Feature tile in the main bathroom running through shower cubicle (white) and along the floor
The built in cupboards in the garage!
From the front door looking to back open plan area
Ensuite double shower with shower niche and feature tile (fancy shmancy!)
The ensuite toilet section (and me in the reflection) with 1/2 wall to rest all the magazines on!
Feature tile in the main bathroom running through shower cubicle (white) and along the floor
The built in cupboards in the garage!
Subscribe to:
Posts (Atom)